Why generic estimates mislead
A growth and automation lead at a UK building society asked us the question most buyers ask early: "So if we were to commit today, how long, how quickly could you get something effectively on the pitch for us?"
Search for an answer and you will find ranges from a month to most of a year. Those figures describe a different kind of project: connecting a platform to cloud infrastructure, core banking or transaction data, then tuning thousands of rules. Checking a mortgage, protection or wealth file against a checklist is narrower. The documents already exist. The checks already exist, usually as the checklist your file reviewers use today. The work is getting the files to the check and agreeing what counts as a fail.
The three things that set go-live time
- How files reach the check. Upload by the team, a connector from the CRM, or an API call from your own systems. This is the biggest single factor.
- Standard or configured checks. A standard suitability or document check can run as it is. A check built around your own checklist, product rules or lender criteria has to be set up and tested first.
- Who acts on the results. Somebody has to own the failed items, decide on overrides and close the file. If that is not agreed before go-live, the first week's results sit unread.
IT time by route
Upload. The team drags files into a web page and the check runs. Nothing is installed, there is no endpoint to open and no change to your CRM. IT time is close to nil, which is why this route suits a quick start or firms whose appointed representatives use different systems.
CRM connector. Files go to the check when a case reaches a set stage, and the result returns to the case record. Ask who builds and maintains the connector. If the vendor does, your side is usually small: an outbound call when the case is submitted and an endpoint to receive the answer. If your team builds it, plan it as a normal change through your release process. Our guide to connecting compliance checks to a mortgage CRM covers this in more detail.
API. Your developers call the check from your own systems. This gives the most control and takes the most internal time, but it can follow your release schedule rather than block the start.
None of these routes has to come first. A firm can start on upload and move to a connector once it knows which checks it wants running on every case.
Compliance team time
The compliance team's work at go-live is mostly decisions, not configuration.
- The checklist. Confirm which questions each file type must answer and what evidence counts. If your reviewers disagree on a question today, settle it now.
- The review rule. Only failed items should need a person. Decide who reviews them, who can override a fail and how the override is recorded.
- The reporting line. Under PRIN 2A.8.3R, the board report sets out "the results of its monitoring under PRIN 2A.9 and any actions required". Decide how check results will feed that report before the first month closes.
- The baseline. Record cost per checked file, coverage and rework before go-live so the benefit can be measured after it. Our guide to building the business case sets out the measures.
Questions to ask before you commit
- Which of the checks we need are standard today, and which need configuring?
- Which route can we start on with no IT work, and what does moving to a connector involve later?
- Who builds and maintains the connector, and what exactly does our side provide?
- Which results need a person, and what does a reviewer see for each fail?
- Is any part of what we want still in development, and is it out of the go-live claim?
The last question matters. A go-live time quoted for standard checks does not cover a check that has not been built yet.
At Curvestone, go-live takes days, and for DA firms and appointed representatives that need standard checks, hours. Upload needs nothing installed and no integration project. Where we build a connector for your CRM, the integration work sits with us; your side is one outbound call and one endpoint for the answer.
Frequently asked questions
How long does it take to implement automated compliance checking?
How much IT time does automated file checking need?
Does the FCA have to approve an automated compliance checking tool?
How to build the business case for automated file checking
A business case for automated file checking compares what your file checks cost and miss today with what an automated check would cost and catch, in your own figures. Build it from five inputs: cost per checked file, coverage, rework, remediation and reviewer time. Then measure the same five before and after go-live.
DefinitionMortgage CRM integration for compliance checks: how it works
Compliance checks can run from inside a mortgage CRM instead of through manual uploads. With an integration, a submitted case goes to the check automatically and the result comes back to the case record. Without one, someone exports the case and drops it in, and the same check runs. The route decides how many cases you can check.

Dawid Kotur
CEO and co-founder, Curvestone
Dawid co-founded Curvestone in 2024 after a decade working at the intersection of financial services and applied machine learning. He writes about the strategic direction of regulated-industry AI, the FCA's evolving approach to model risk, and the operational changes UK lenders are making in response to Consumer Duty. He sits on the FCA Smart Data Accelerator advisory cohort.
LinkedIn